Feasibility Study Complete for KPRT

April, 2013 – Alta Planning + Design completes feasibility study for the proposed Kingston Point Rail Trail. The study was funded by the City of Kingston, through a CDBG allocation, with matching funds provided by the Hudson River Valley Greenway. Click here to download a copy of the final report.

1 comment to Feasibility Study Complete for KPRT

  • Peter Baker

    A well written and comprehensive report. I particularly like that the Trolley Museum efforts are being taken into consideration. The plan has the potential to be a win-win for the involved stakeholders. THANK YOU!

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>